Get my price
White kitchen with a copper range hood, black lantern pendants and a long wood island with a white quartz top

About

Your kitchen price, before anyone visits

An independent kitchen remodeling service for Mason and the towns around it.

Price first

Built from what Cincinnati trades earn, real material costs, permits and a normal margin.

Design it

See your kitchen in 3D. Every choice updates the price.

Licensed partners

A licensed local contractor confirms the price and does the work.

Why the price comes first

Why no two kitchen quotes agree

Ask three contractors to quote one kitchen and the numbers can look like three different jobs. One comes in at half. One runs 20% above the rest. Not one of them says why.

Plenty of quotes are a gut number, or a form letter that four other homeowners got the same week. A real price means looking up what local electricians, plumbers and installers earn right now, and what your cabinets, counters and appliances cost. That is slow work, so it gets skipped.

We did the slow work. The price tool builds your kitchen one line at a time from Cincinnati trade wages and current material costs, so nothing is tucked away. That is fair to you, and fair to the contractor who builds it.

Same kitchen, three numbers

Half the others
Quote oneWhat got left out?
20% over
Quote twoWhere does the extra go?
Nothing hidden
LaborMaterialsPermitsAppliances
Your price

Your price: labor, materials, permits, appliances, each on its own line.

How it works

From price to finished kitchen

  1. 01

    About 60 seconds

    Get the number

    Tell the tool the size of your kitchen and what is changing: cabinets, counters, an island, appliances, floors, lighting. Add your ZIP. You get three finish levels, each broken out line by line from Cincinnati wage data.

  2. 02

    A few minutes

    Lay it out in 3D

    Pick the layout that matches your room, from a galley to an L with an island. Choose doors, colors, hardware, counters, backsplash and floor, then look at it from every side. The price follows each choice.

  3. 03

    When you say so

    Get it measured

    A licensed local contractor visits, measures, checks the wiring and plumbing and confirms your number. That visit only happens when you ask for it.

  4. 04

    Usually 4 to 8 weeks of work

    Build it

    Permits get filed and cabinets get ordered, which usually takes 3 to 8 weeks. Once work starts, a kitchen that keeps its layout is typically done in 4 to 8 weeks.

Gray cabinets, open wood shelves and a reclaimed wood peninsula with three counter stools

See your kitchen price

About a minute. Your ZIP, your finishes, your kitchen in 3D.