
Kitchen services
Every part of a kitchen remodel
Nine parts of the job. Pick the ones in yours, see the price, then see the room.
Cabinet replacement
Full new cabinets: boxes, doors and drawers. Usually the largest line.
Price it
Cabinet refacing
New doors and drawer fronts on the cabinet boxes you keep.
Price it
Countertops
Quartz, granite or wood tops cut after the cabinets are in.
Price it
Kitchen islands
More prep space, more storage and somewhere to sit.
Price it
Open layouts
Opening the kitchen to the family or dining room.
Price it
Backsplash and tile
Tile or a stone slab on the wall behind the counters.
Price it
Kitchen flooring
Tile, wood or luxury vinyl that can take kitchen traffic.
Price it
Lighting and electrical
Recessed lights, pendants and the circuits code calls for.
Price it
Sinks and plumbing
A new sink and faucet, in place or moved somewhere better.
Price it
How it works
Four steps, at your pace
- 01
About 60 seconds
Get the number
Tell the tool the size of your kitchen and what is changing: cabinets, counters, an island, appliances, floors, lighting. Add your ZIP. You get three finish levels, each broken out line by line from Cincinnati wage data.
- 02
A few minutes
Lay it out in 3D
Pick the layout that matches your room, from a galley to an L with an island. Choose doors, colors, hardware, counters, backsplash and floor, then look at it from every side. The price follows each choice.
- 03
When you say so
Get it measured
A licensed local contractor visits, measures, checks the wiring and plumbing and confirms your number. That visit only happens when you ask for it.
- 04
Usually 4 to 8 weeks of work
Build it
Permits get filed and cabinets get ordered, which usually takes 3 to 8 weeks. Once work starts, a kitchen that keeps its layout is typically done in 4 to 8 weeks.

Price your whole kitchen
Choose what is in the job. The price moves with every choice.