
Cabinet replacement
Kitchen cabinet replacement in Mason
New cabinets set level and laid out for the way your family cooks.

Builder grade boxes are swelling at the sink, drawers sag, or you want uppers that run to the ceiling.
The old cabinets come out, new boxes are set and leveled, doors and drawers are hung and tuned, then trim and pulls. Counters get measured right after.
- 01Door choice
Shaker stays in style for decades. A flat slab door in white oak or a deep color looks current and cleans easily.
- 02Box construction
Plywood boxes cost a little more than particle board and hold up much better around a leak.
- 03Timeline
Semi custom cabinets usually arrive in 3 to 8 weeks. Setting them takes 2 to 4 days.
In the price tool
See it before anyone comes out
- 01Every line, in plain numbers
Labor for each trade, materials and permits, using this year's Cincinnati wage data.
- 02Walk around it in 3D
Choose your layout, door style, colors and counters, then turn the room any way you like.
- 03No visit until you ask
A licensed contractor comes out only after you request it.
Cabinet replacement
Cabinet replacement questions
Q1What do new cabinets cost in Mason?
It depends on the cabinet line, the door and how many boxes your room takes. Pick them in the price tool and you see the number in about a minute.
Q2Will my current counters survive?
Rarely. Stone tends to crack on the way off. New cabinets almost always mean new counters.
Q3How many days is the install?
Usually 2 to 4 days once the cabinets show up.

Price it with your choices
Doors, counters, an island. The price follows every pick.


